PPSR Production Preparation Status Report
PQA Process Quality Assurance
PR Program Readiness
Pre-Launch 试生产
price-driven costing 价格引导成本
Production Preparation-Final Nissan - PT2/Renault - PP
Production Preparation-Initial Nissan - PT1/Renault - PPP3
Production Trial Run 试生产
Prototype 样件
QFD Quality Funtion Deploy质量功能展开
QFTT Quality Functional Task Team
QR- Quality Reject 质量拒收
QS Quality Standard
RAN Release Authorisation Number
reverse 倒车档
RFQ Request For Quotation询价
RKD Reverse Knock Down
RLQ Receiving Lot Quantity
ROC Rate of Climb
ROI return on investment 报酬率
ROP Re-Order Point
RTO Required To Operate
SAIS Supplier Assessment & Improvement System
SC Strategic Confirmation/significant Charac'teristics
SDS- System/ Design Specifications 系统/设计说明
second gear 二档
SFMEA System FMEA
Shipping Date 出货日、Invoice Date 发票日或On Board Date 装船日
Side Windshield 侧窗玻璃
SJ Strategic Intent
SNP Standard Number of Parts
SOW- state of work 工作申明
SPC Statistical Process Control
SQA Supplier Quality Assurance
SREA- Supplier Request for Engineering Approval 供应商工程设计更改申请
PQA Process Quality Assurance
PR Program Readiness
Pre-Launch 试生产
price-driven costing 价格引导成本
Production Preparation-Final Nissan - PT2/Renault - PP
Production Preparation-Initial Nissan - PT1/Renault - PPP3
Production Trial Run 试生产
Prototype 样件
QFD Quality Funtion Deploy质量功能展开
QFTT Quality Functional Task Team
QR- Quality Reject 质量拒收
QS Quality Standard
RAN Release Authorisation Number
reverse 倒车档
RFQ Request For Quotation询价
RKD Reverse Knock Down
RLQ Receiving Lot Quantity
ROC Rate of Climb
ROI return on investment 报酬率
ROP Re-Order Point
RTO Required To Operate
SAIS Supplier Assessment & Improvement System
SC Strategic Confirmation/significant Charac'teristics
SDS- System/ Design Specifications 系统/设计说明
second gear 二档
SFMEA System FMEA
Shipping Date 出货日、Invoice Date 发票日或On Board Date 装船日
Side Windshield 侧窗玻璃
SJ Strategic Intent
SNP Standard Number of Parts
SOW- state of work 工作申明
SPC Statistical Process Control
SQA Supplier Quality Assurance
SREA- Supplier Request for Engineering Approval 供应商工程设计更改申请